Utilize este identificador para referenciar este registo: http://hdl.handle.net/10071/5663
Registo completo
Campo DCValorIdioma
dc.contributor.authorPedro, Maria Isabel-
dc.contributor.authorPereira, João-
dc.contributor.authorFilipe, José António-
dc.contributor.authorFerreira, Manuel Alberto M.-
dc.date.accessioned2013-09-30T14:02:51Z-
dc.date.available2013-09-30T14:02:51Z-
dc.date.issued2011-
dc.identifier.citationPedro, M. I., Pereira, J., Filipe, J., & Ferreira, M. A. M. (2011). Complex projects’ management using eva: A case study. Aplimat - Journal of Applied Mathematics, 4(3), 58-68. http://hdl.handle.net/10071/5663-
dc.identifier.issn1337-6365por
dc.identifier.urihttp://hdl.handle.net/10071/5663-
dc.description.abstractEarned Value Analysis (EVA) is a method of measuring the project performance. Although the concept exists since the nineteen’s century and it has been in use since the 1960s, only now it is gaining considerable popularity. Those in favour will base their arguments in the cost savings from the project and the improved communication, analysis and control that come from its implementation. Those who have a different opinion will cite the limited benefit from its use and the effort to make it work. There is no doubt that these different opinions come from different experiences. Nevertheless, everybody agrees that EVA is a powerful tool if applied correctly. The aim of this work is to implement this tool to a project in concrete and to evaluate the use of EVA as a complementary tool of the system currently used – SAPE, in determining and controlling costs associated with the project, at every moment of the project. This allows to evaluate the possible deviations and to enable timely corrections.por
dc.language.isoengpor
dc.publisherSlovak University of Technologypor
dc.rightsopenAccesspor
dc.subjectIntegrated Management Systemspor
dc.subjectControlo de projecto -- Project controlpor
dc.subjectERPpor
dc.subjectSAPEpor
dc.subjectGestão de sistemas de informação -- Information systems managementpor
dc.subjectEarned Value Analysispor
dc.titleComplex projects’ management using eva: A case studypor
dc.typearticlepor
dc.pagination58-68por
dc.publicationstatusPublicadopor
dc.peerreviewedSimpor
dc.journalAplimat - Journal of Applied Mathematicspor
dc.distributionInternacionalpor
dc.volume4por
dc.number3por
dc.subject.fosDomínio/Área Científica::Ciências Naturais::Matemáticas-
Aparece nas coleções:DM-RI - Artigos em revistas científicas internacionais com arbitragem científica

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
article_hdl5663.pdf143,52 kBAdobe PDFVer/Abrir


FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpaceOrkut
Formato BibTex mendeley Endnote Logotipo do DeGóis Logotipo do Orcid 

Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.