Utilize este identificador para referenciar este registo: http://hdl.handle.net/10071/12267
Autoria: Andrade, A. R.
Teixeira, P. F.
Data: 2016
Título próprio: Exploring different alert limit strategies in the maintenance of railway track geometry
Volume: 142
Número: 9
Paginação: 04016037
ISSN: 0733-947X
DOI (Digital Object Identifier): 10.1061/(ASCE)TE.1943-5436.0000867
Palavras-chave: Railways
Maintenance strategy
Markov policies
Planned and unplanned costs
Railway track geometry
Resumo: This paper explores a quantitative model with different maintenance strategies to control railway track geometry degradation in Portugal. The alert limits put forward by the international standards are assessed regarding the planned and unplanned impacts associated with those limits, namely preventive maintenance and renewal costs, corrective maintenance costs, planned infrastructure delays due to changes in the maximum permissible speed, and unplanned infrastructure delays due to temporary speed restrictions. The effects of different choices for the alert limits of the main quality indicators for railway track geometry are assessed, considering a cost penalty due to delays set by the regulatory entity. Finally, a sensitivity analysis is conducted on the effect of this delay cost penalty on the optimized choice of the alert limits for both quality indicators.
Arbitragem científica: yes
Acesso: Acesso Embargado
Aparece nas coleções:BRU-RI - Artigos em revistas científicas internacionais com arbitragem científica

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
_asce_te_1943_5436_0000867_1.pdf
  Restricted Access
Versão Editora364,86 kBAdobe PDFVer/Abrir Request a copy


FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpaceOrkut
Formato BibTex mendeley Endnote Logotipo do DeGóis Logotipo do Orcid 

Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.