M|G|∞ queue systems busy period and logistics
| dc.contributor.author | Ferreira, Manuel Alberto M. | |
| dc.date.accessioned | 2013-10-03T14:15:36Z | |
| dc.date.available | 2013-10-03T14:15:36Z | |
| dc.date.issued | 2003 | |
| dc.description.abstract | In the M|G|∞ queueing systems customers arrive according to a Poisson process at rate . Each of them receives immediately after its arrival a service whose length is a positive random variable with distribution function G(.) and mean value a . An important parameter of the system is the traffic intensity . The service of a customer is independent of the services of the other customers and of the arrival process. The busy period of a queueing system begins when a customer arrives there, finding it empty, and ends when a customer leaves the system letting it empty. During the busy period there is always at least one customer in the system. Therefore in a queueing system there is a sequence of idle and busy periods. For these systems with infinite servers the busy period length distribution is difficult to derive, except for a few exceptions. But we present formulas that allow the calculation of some of the busy period length parameters for the M|G|∞ queueing system. These results can be applied in logistics. For instance to the failures that occur in the operation of a fleet of aircraft, of shipping or of trucking. The customers are the failures. And its service time is the time that goes from the instant at which they occur till the one at which they are completely repaired. Here a busy period is a period in which there is at least one failure waiting for reparation or being repaired. The formulas referred allow the determination of measures of the system performance. | por |
| dc.event.date | 5-7 Fevereiro | por |
| dc.event.location | Bratislava | por |
| dc.event.title | 2nd Internacional Conference Aplimat | por |
| dc.event.type | Conferência | por |
| dc.identifier.citation | Ferreira, M. A. M. (2002). M|G|∞ queue systems busy period and logistics. 2nd International Conference Aplimat (pp. 329-332). Slovak University of Technology. http://hdl.handle.net/10071/5689 | |
| dc.identifier.uri | http://hdl.handle.net/10071/5689 | |
| dc.language.iso | eng | por |
| dc.pagination | 329-332 | por |
| dc.peerreviewed | Sim | por |
| dc.publicationstatus | Publicado | por |
| dc.publisher | Slovak University of Technology | por |
| dc.rights | open access | por |
| dc.subject | M|G|∞ | por |
| dc.subject | Busy period | por |
| dc.subject | Failures | por |
| dc.subject.fos | Domínio/Área Científica::Ciências Naturais::Matemáticas | |
| dc.title | M|G|∞ queue systems busy period and logistics | por |
| dc.type | conferenceObject | |
| dspace.entity.type | Publication | en |
Ficheiros
Pacote original
1 - 1 de 1
A carregar...
- Nome:
- conferenceObject_hdl5689.pdf
- Tamanho:
- 236.65 KB
- Formato:
- Adobe Portable Document Format
