Neural hierarchical interpolation time series for reservoir level multi-horizon forecasting in hydroelectric power plants

dc.contributor.authorStefenon, S. F.
dc.contributor.authorSeman, L. O.
dc.contributor.authorYamaguchi, C. K.
dc.contributor.authorCoelho, L. dos S.
dc.contributor.authorMariani, V. C.
dc.contributor.authorMatos-Carvalho, J. P.
dc.contributor.authorLeithardt, V. R. Q.
dc.date.accessioned2025-03-26T16:20:42Z
dc.date.available2025-03-26T16:20:42Z
dc.date.issued2025
dc.date.updated2025-04-04T10:44:24Z
dc.description.abstractEnergy planning in systems heavily influenced by hydroelectric power is based on assessing the availability of water in the future. In Brazil, based on the soil moisture active passive, the National Electricity System Operator defines electricity dispatch concerning a stochastic optimization problem. Currently, machine learning models are an alternative for improving forecasts, and could be a promising solution for predicting reservoir levels at hydroelectric dams. In this paper, neural hierarchical interpolation for time series (NHITS) is applied to improve forecasts and thus help decision-making in the management of electric power systems. The NHITS model achieved a root mean square error of 4.64×10−4 for a 1-hour forecast horizon, and 1.03×10−3 for a 10-hour forecast horizon, being superior to multilayer perceptron (MLP) neural network, long short-term memory (LSTM), convolutional neural network with long shortterm memory (CNN-LSTM), recurrent neural network (RNN), Dilated RNN, temporal convolutional neural (TCN), neural basis expansion analysis for interpretable time series forecasting (N-BEATS), and deep nonparametric time series forecaster (DeepNPTS) deep learning approaches.eng
dc.description.versioninfo:eu-repo/semantics/publishedVersion
dc.identifier.citationStefenon, S. F., Seman, L. O., Yamaguchi, C. K., Coelho, L. dos S., Mariani, V. C., Matos-Carvalho, J. P., & Leithardt, V. R. Q. (2025). Neural hierarchical interpolation time series for reservoir level multi-horizon forecasting in hydroelectric power plants. IEEE Access, 13, 54853-54865. https://doi.org/10.1109/ACCESS.2025.3554446
dc.identifier.doi10.1109/ACCESS.2025.3554446
dc.identifier.issn2169-3536
dc.identifier.urihttp://hdl.handle.net/10071/33993
dc.language.isoeng
dc.pagination54853 - 54865
dc.peerreviewedyes
dc.publisherIEEE
dc.relationinfo:eu-repo/grantAgreement/FCT/6817 - DCRRNI ID/UIDB%2F00066%2F2020/PT
dc.relationCOFAC/ILIND/COPELABS/1/2024
dc.relationUID/00408/2025
dc.relationinfo:eu-repo/grantAgreement/FCT/6817 - DCRRNI ID/UIDB%2F04111%2F2020/PT
dc.rightsopen access
dc.subjectEnergy planningeng
dc.subjectHydroelectric power plantseng
dc.subjectNeural hierarchical interpolationeng
dc.subjectTime series forecastingeng
dc.subject.fosDomínio/Área Científica::Ciências Naturais::Ciências da Computação e da Informaçãopor
dc.subject.fosDomínio/Área Científica::Engenharia e Tecnologia::Engenharia Eletrotécnica, Eletrónica e Informáticapor
dc.titleNeural hierarchical interpolation time series for reservoir level multi-horizon forecasting in hydroelectric power plantseng
dc.typearticle
dc.volume13
dspace.entity.typePublicationen
iscte.identifier.cienciahttps://ciencia.iscte-iul.pt/id/ci-pub-110195
iscte.journalIEEE Access
iscte.subject.odsIndústria, inovação e infraestruturaspor
iscte.subject.odsCidades e comunidades sustentáveispor

Ficheiros

Pacote original

A mostrar 1 - 1 de 1
A carregar...
Nome:
article_110195.pdf
Tamanho:
1.45 MB
Formato:
Adobe Portable Document Format
Descrição:
Versão Editora