Skip navigation
Logo
User training | Reference and search service

Library catalog

Retrievo
EDS
b-on
More
resources
Content aggregators
Please use this identifier to cite or link to this item:

acessibilidade

http://hdl.handle.net/10071/8892
acessibilidade
Title: Conceção e implementação de metodologia time-driven activity-based costing numa empresa de transportes
Authors: Silva, Cristina Isabel da Conceição
Orientador: Rodrigues, José Maria Azevedo
Keywords: Controlo de gestão
Sistema de controlo de gestão
Sistemas de custeio tradicionais
Sistema de custeio Activity-Based Costing (ABC)
Sistema de custeio por atividades
Sistema de custeio Time-Driven
Activity-based costing (TDABC)
Sistema de custeio por atividades e tempo
Issue Date: Jun-2014
Citation: SILVA, Cristina Isabel da Conceição - Título: subtítulo [Em linha]. Lisboa: ISCTE-IUL, 2014. Dissertação de mestrado. [Consult. Dia Mês Ano] Disponível em www:<http://hdl.handle.net/10071/8892>.
Abstract: Os sistemas de controlo de gestão são cada vez mais importantes no apoio à gestão e à implementação estratégica para a tomada de decisão, através das suas inúmeras ferramentas que visam garantir o alinhamento dos gestores descentralizados com os objetivos estratégicos das organizações, em prol da criação de valor. Permite a descentralização da tomada de decisões, responsabiliza os gestores pelas boas ou más decisões e proporciona um sistema de avaliação rigoroso. Um dos instrumentos de controlo de gestão, o Time-Driven Activity-Based Costing (TDABC) representa um modelo de custeio alternativo aos sistemas mais tradicionais da contabilidade de custos e resulta da evolução do Activity-Based Costing (ABC), que ao longo dos anos se foi mostrando de implementação difícil, demorada e dispendiosa.
The management control systems are increasingly important in supporting the management and strategic decision, through its numerous tools that see to align managers with the strategic objectives of the organizations for the creation of value. It allows the decentralization of the decision taking, it holds the managers responsible for the good or bad decisions and it provides a rigorous and coherent system of evaluation. The tool Time-Driven Activity-Based Costing (TDABC) is an alternative way to solve the problems with the Activity-Based Costing (ABC) systems. Many companies abandoned the Activity-Based Costing (ABC) systems, because this cost system method proved incapable over time to collect the complexity of his operations, he needs a slow implementation and a very expensive to apply and to uphold.
Description: Mestrado em Gestão / JEL Classification System M 40 – General M41-Accounting
Peer reviewed: Sim
URI: http://hdl.handle.net/10071/8892
Thesis identifier: 201030829
Appears in Collections:T&D-DM - Dissertações de mestrado

Files in This Item:
acessibilidade
File Description SizeFormat 
Tese_TDABC em empresa setor transportes.pdf2.08 MBAdobe PDFView/Open    Request a copy


FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpace
Formato BibTex MendeleyEndnote Currículo DeGóis 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.